Skip to page body Home About Portola Valley What's New For Residents Building & Planning Sustainability Town Government

2013 Road Resurfacing Project

The Town of Portola Valley will be performing street resurfacing and improvement work on the following streets between May 15 and June 28, 2013, weather permitting (view schedule). Repairs will include grinding worn areas, crack sealing, surface treatment of slurry sealing or cape sealing, and repainting traffic markings.

Traffic will be limited through these streets during the resurfacing process, with traffic controls in place in the construction areas. Normal construction hours are Monday through Friday from 8 a.m. to 5:30 p.m. Parking control signage with date and times of construction activity will be posted in construction areas two days prior to commencement of work. Roads will be reopened to full traffic and parking at the end of each working day; however, please note that removal of the surface asphalt will result in loose gravel and an uneven pavement surface during this phase of the project.

ROADS (entire lengths)
Adair Lane      
Antonio Court
Applewood Lane
Arastradero Road (to Town limits)
Campo Road
Cordova Court
Grove Drive (asphalt overlay from Tinturn to end)
Iroquois Trail *
Los Charros Lane
Montara Court
Palmer Lane
Sausal Drive
Shawnee Pass *
Shoshone Place
Sierra Lane    
Tagus Court
Tan Oak Drive
Valencia Court
Wyndham Drive

* Street will be resurfaced when school is not in session, either on a Saturday or after June 14.

We are aware that there will be residents who will be inconvenienced by the street resurfacing work and we ask for your cooperation and understanding. These improvements will result in an improved street that will serve the area for many years. 

If you have any questions about the street resurfacing project, please call Public Works Director Howard Young via email or at 650-851-1700 ext. 200.

Last updated: 5/23/2013 6:59:14 AM